Designed to enhance the well-being of your family’s daily life, all 61 apartments communicate with the exterior space. Turquesa has the particularity of being a residential condominium designed under a central square, where tranquility, security and privacy are an added value.

At Turquesa you can find the perfect symbiosis between the energy of the city and the tranquility of outdoor living, with a panoramic view of the Tejo river.

Features

  • Electric vehicle chargers
  • Common spaces
  • Outdoor spaces: private and common

Location

Turquesa is located in an apartment area with quick and practical access.

From the seafront to the city centre, there are plenty of possibilities for you to move around peacefully. A neighbourhood located at the centre of an apartment area, where everything is at a short walking distance. Served by local retail, schools and services, with Algés close by to expand this offer.de a Algés que reforça toda esta oferta.

On foot or by bicycle and with the whole family, you'll be able to enjoy everything this riverside area and Jamor Park have to offer.

Construction

August 2024

Project in conclusion | Balconies and terraces

June 2024

Project in conclusion | Inspections in progress

April 2024

Gardens in the central square | Blocks C and D: in conclusion

February 2024

Exterior Façade | Sidewalk in the inner courtyard | Blocks A and B: in conclusion

December 2023

Sidewalk in the inner courtyard | Blocks A and B: in conclusion | Blocks C and D: kitchen assembly

October 2023

Continuation of exterior arrangements | Completion of facades and removal of scaffolding | Block A and B: Carpentry completed in the interiors

September 2023

Construction work evolution video | Start of exterior repair work | Kitchen assembly

August 2023

Tile facade completed | Block A and B: installation of wooden flooring and development of interior carpentry

July 2023

Beginning of elevator installation | Dismantling of the scaffold from the interior facade of Block A

June 2023

Construction work evolution video | Tiled Facade

June 2023

Block A: False ceilings and placement of frames | Block C and D: Masonry and stucco

April 2023

Slabs and Stairs

March 2023

4th Floor

January 2023

3rd floor Building C

December 2022

Buildings C and D

December 2022

Blocks A and B: structure of all floors completed and masonry almost finished

December 2022

Basement: Base slab, peripheral containment and foundations.

October 2022

Completion of work on the roof slab of Block A

October 2022

Peripheral containment works, excavation, foundations and -2 slab basement. Block C and D

September 2022

Peripheral containment works, excavation, foundations and -2 slab basement: Block A and B

August 2022

Peripheral containment works, excavation, foundations and -2 slab basement

June 2022

Peripheral containment works, excavation, foundations and -2 slab basement

March 2022

Peripheral containment works, excavation, foundations and -2 slab basement

November 2021

Demolitions