Flower Tower Camellia
Flower Tower Camellia
Leça da Palmeira|Porto

Flower Tower Camellia

Commercialization | Construction

Flower Tower Camellia will be the second tower of the promotor, featuring 21 floors and 134 apartments. Another iconic building, signed by OODA architecture, a perfect fusion of architectural originality and organic elements.

All 134 apartments were designed in great detail, to offer major functionality, privileging natural light and common areas. These homes meet new residential standards, concepts and needs.

Balanced areas with well-organised interior spaces that provide a practical and sustainable use, with modern and original finishings, always enhanced by a balcony.

The first appartments are expected to be completed and handed over in the fourth quarter of 2025.

Features

130 apartments
  • Electric vehicle chargers
  • Common spaces
  • Parking & storage
  • Fitness space
  • Outdoor spaces: private and common
Map of finishes

Location

20 minutes from Porto and an 8-minute walk from the centre of Leça da Palmeira

The Flower Tower is located in a quiet area with easy access to the city center of Porto. 8 minutes walk from the center of Leça da Palmeira and just a bridge away from Matosinhos.

To live in Leça da Palmeira is to choose a quality of life. Leça is a destination increasingly sought after for its authenticity. It combines history, architecture, nature and a youthful spirit.

Availabilities

Showing {{ unidades_list.length }} of {{ total }}
, filtered by
No apartments available at the moment.
No apartments available at the moment.

Construction

July 2024

Preparation of the floor slab 14

July 2024

Concreting the floor slab 10

May 2024

Preparation of the floor slab 7

April 2024

Completion of the 3rd Floor Slab

April 2024

Floor 3 Slab Formwork

January 2024

Completion of Containment Work and Floor Slab -1

December 2023

Start of Work on the Base Slabe

October 2023

Continuation of Excavation and Containment Works

July 2023

Start of Excavation and Containment Works

July 2023

Site Preparation for Construction: Start of Shypyard Assembly

Request Info

Please contact our team if you would like to receive more information about this project.

I'm interested in the typologies